Hubbardton-forge 137630 User Manual Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 4
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
Assembly & Installation Instructions A274
For Pendant 13-7630 Page 2 of 4
Hand-Forged, Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
24824 Rev A
To Complete Fixture Assembly
(Figures 3 & 4)
Component Parts
A Fixture Pipe (2)
C Hex Nipple
F Canopy Pipe (2)
G Clutch (2)
H Plastic Clutch Sleeve (2)
I Set Screw (2)
J Canopy
Caution: Be sure power is off at the main breaker box prior to
installation.
1. Thread wires from the fixture pipe (A) through canopy (J).
Slide canopy (J) down fixture pipe (A) until it rest on top of fixture.
2. Thread the wires from the fixture pipe (A) into and through the
canopy pipe (F) up through the hex nipple (C).
3. Unscrew the clutch (G) from the canopy pipe (F); slide it across the
wires and onto the fixture pipe (A). Follow this with the plastic
clutch sleeve (H), oriented so the tapered end of the clutch sleeve
nests in the clutch (Figure 3).
4. Slide the canopy pipe (F) as far as necessary to give you the total
length of the fixture which you desire. Be careful not to scratch the
pipe surfaces and to pull excess wire up through the canopy pipe
(F). Screw clutch (G) onto canopy pipe (F). There must be a
minimum 1-1/2" of inner pipe inside the outer pipe. Hand-tighten
the clutch to temporarily hold this adjustment. The clutch is not
securely fastened at this point; do not depend on it to hold the
fixture.
Important: To ensure full connection strength, be sure the tapered
end of the plastic clutch sleeve is oriented toward the clutch when
assembled and securely tighten set screw
(Figure 3).
5. Continue with Ceiling Installation below.
(continued)
(Figure 3)
(Figure 4)
Page view 1
1 2 3 4

Comments to this Manuals

No comments